Banner map engl

Floating power plants should appear in Ukraine

19 September 2024

The government allowed it

At its meeting on September 13, the Cabinet of Ministers, by Resolution No. 1069, approved measures to organize the installation of gas piston and/or gas turbine units on vessels of the technical fleet. They are marked "for official use".

Also, with this document, the government decided to make appropriate changes to the Cabinet of Ministers' resolutions.

In particular, according to these changes, the purchase of gas piston, gas turbine cogeneration plants, gas turbine plants and block-modular boiler houses (their components), their rental, as well as the purchase of services related to it can be done by concluding a contract without the use of open tenders.

The government also exempted the installers of such mini thermal power plants from the need to obtain town planning conditions, allocation of land plots and from some other bureaucratic procedures.

As reported by "Ukrainian Energy", Energoatom plans to build the fifth power unit of the Rivne NPP.


 index 280%d1%85360 web eng